Open for Investment 🏗️ Pre-Commissioning (90% Complete) 🛡️ Risk: High

Ibadan Economic Zone Warehouses

Plot 50-65, Ibadan Free Trade Zone, Lagos-Ibadan Expressway, Ibadan, Oyo State (Oyo State) • Developer: Oyo Logistic Hubs & Warehousing PLC

1. Overview & Investment Thesis

Industrial warehouse development serving the Ibadan Economic Zone. The project comprises 12 large-format logistics warehouses targeting e-commerce and manufacturing tenants. Strong fundamentals driven by Ibadan's growing role as a logistics hub between Lagos and northern Nigeria.

Key Project Highlights

⭐ Industrial logistics growth
⭐ E-commerce demand
⭐ Ibadan hub location
⭐ Short investment duration
🏢
Oyo Logistic Hubs & Warehousing PLC
✓ Verified Institutional Developer Partner

Market leader in western Nigerian logistics parks with over 80,000 sqm of modern industrial storage commissioned since 2018.

📍 Headquarters: Oyo, Nigeria
🏛️ Trustee Custody: First Custodian Trustees Ltd (SEC Registered)

📍 Location & Growth Corridor

Address: Plot 50-65, Ibadan Free Trade Zone, Lagos-Ibadan Expressway, Ibadan, Oyo State

Coordinates: 7.3775, 3.9470 Zoning: Approved Development Regional Growth Rate: +14.5% p.a. capital appreciation

2. Financial Information & Returns

Minimum Investment
₦150,000
Low entry threshold
Target Capitalization
₦30,000,000
Total project equity
Amount Raised
₦24,900,000
83% funded to date
Projected Return (ROI)
25.0% p.a.
Annualized yield
Investment Tenor
12 Months
Contract maturity window
Payout Frequency
Quarterly
Next: September 30, 2026
💳 Distribution Policy & Automated Wallet Payouts

Accrued daily and paid quarterly to investor wallets. Full capital returned upon 12-month loan maturity.

⚡ Direct AGS Wallet Automation 📅 Frequency: Quarterly Logistics Lease Revenue + Bullet Capital Exit 🔒 Segregated Escrow Account

🧮 Interactive Return Calculator

₦
Minimum required: ₦150,000
Projected Annual Profit
₦--
Total Payout at Maturity
₦--
Monthly Equiv. Yield
₦--

3. Project Information & Development Plans

Facility Classification
Grade-A High-Bay Logistics Park
Total Storage Capacity
22,000 sqm across 12 Standard Warehouses
Clear Ceiling Height
12.5 meters (Allows 6-level high rack storage)
Floor Load Capacity
7.5 Tonnes / sqm Heavy-Duty Polished Concrete
Loading Docks
24 Hydraulic Dock Levelers with Weather Seals
Access & Logistics
Direct interchange to Lagos-Ibadan 8-lane expressway
Overall Project Construction Progress Pre-Commissioning (90% Complete)

4. Milestone Timeline

Funds from investors are held in custody and disbursed strictly against certified engineering completion milestones.

Phase 1: Free Trade Zone Land Rights Completed ✓
Target Date: Q2 2024  •  99-year industrial concession obtained from Oyo State Government.
Phase 2: Site Levelling & Deep Slab Foundations Completed ✓
Target Date: Q4 2024  •  Industrial laser-screeded concrete slabs poured.
Phase 3: Pre-Engineered Steel Superstructure Completed ✓
Target Date: Q1 2025  •  Erection of high-tensile steel frames and insulated sandwich panels.
Phase 4: Dock Levelers & Fire Suppression Completed ✓
Target Date: Q3 2025  •  Automatic ESFR sprinkler systems and 24 hydraulic dock bays installed.
Phase 5: Yard Paving & Weighbridge Calibration In Progress ⏳
Target Date: Q1 2026 – Q2 2026  •  Heavy trailer apron paving and 80-tonne weighbridge installation.
Phase 6: E-Commerce Tenant Handover & Payoff Upcoming 📅
Target Date: Q3 2026  •  FMCG and e-commerce distribution begins; principal payout to investors.

5. Legal Documents & Disclosures

Download and review official offering documents, building permits, registered titles, and due diligence audits.

📑
Logistics Park Investment Memorandum
PDF • 3.9 MB
Download ⬇
⚖️
Terms of Investment & Debenture Agreement
PDF • 1.4 MB
Download ⬇
🏛️
Oyo State Industrial Development Approval
PDF • 2.2 MB
Download ⬇
📜
Registered Industrial Concession Certificate
PDF • 1.6 MB
Download ⬇

6. Risk Disclosures & Mitigation Strategy

Every real estate crowdfunding investment involves specific project risks. Review our formal mitigation safeguards below:

Risk Category Severity Level Mitigation & Protective Safeguards
Supply Chain & Fuel Price Risk Medium Risk Park strategically situated directly at the Lagos-Ibadan rail cargo terminus to hedge trucking cost volatility.
Tenant Lease Concentration Low Risk Space partitioned among 4 diversified corporate tenants (FMCG, retail pharmaceuticals, cold chain).
Asset Liquidity Risk Low Risk 12-month short tenor with guaranteed institutional refinance takeout pre-arranged with Stanbic IBTC.
⚠️
Statutory Risk Disclaimer: Industrial investments carry higher risk including economic cycles and tenant concentration risk.
Property Comparison
0 of 4 properties selected